Mirfield to Dewsbury to Leeds (M2D2L) Transport Scheme - phase 1 consultation (2020)

Share Mirfield to Dewsbury to Leeds (M2D2L) Transport Scheme - phase 1 consultation (2020) on Facebook Share Mirfield to Dewsbury to Leeds (M2D2L) Transport Scheme - phase 1 consultation (2020) on Twitter Share Mirfield to Dewsbury to Leeds (M2D2L) Transport Scheme - phase 1 consultation (2020) on Linkedin Email Mirfield to Dewsbury to Leeds (M2D2L) Transport Scheme - phase 1 consultation (2020) link

This engagement has now closed, thank you for taking part.

You can read the Consultation Outcomes Report by clicking the link under 'Documents'.

Take a look at the 
2021 consultation page for the latest plans and updates.


Background

Kirklees Council and Leeds City Council, in partnership with the West Yorkshire Combined Authority, are developing an initial scheme for the A644 and A653 routes between Mirfield – Dewsbury – Leeds, that aims to improve travel opportunities, reliability and the local environment 

The scheme will help to promote access to jobs, education and services, and improvements in public health and includes new cycle tracks, new pedestrian crossings and footway improvements, bus lanes and bus super-stops (upgraded bus stops), junction upgrades, and other highway space adjustments. 

We would like to hear your views on the proposed improvements and would particularly like your feedback on the proposals to: 

  • Improve walking and cycling facilities 
  • Enhance bus lanes and facilities to improve bus reliability 
  • Upgrade junctions to improve congestion 
  • Improve landscaping 
  • Improve air quality 

The roads in question are key transport routes through areas of north Kirklees and south Leeds that are the focus of significant planned housing and economic growth over the next 10-15 years. Proposals for several major development sites are being worked up and will be brought forward / built at different speeds. It is important to recognise that the proposals being consulted on now for the Mirfield-Dewsbury-Leeds (Phase 1) project represent one stage of a longer term programme of transport investment into the area that will include:  

  • Alterations to road junctions to provide access to new development sites, often in phases 
  • Investment into the Transpennine rail network and stations, for example, through 
     the Transpennine Route upgrade
  • Upgrades at Mirfield, Ravensthorpe and Dewsbury stations and on the railway lines 
  • Transforming Cities Fund (TCF) projects, particularly in and around Dewsbury (projects for 
     Dewsbury Bus Station and Halifax Rd-Bradford Rd-Ring Road Junction will be publicly consulted 
     on in winter 2020/spring 2021 as part of the TCF programme). For more information 
     click here(External link) (open in a new tab)
  • Future phases of the Mirfield-Dewsbury-Leeds scheme, subject to new funding 
  • Exploration and assessment of strategic highway scheme options in North Kirklees to relieve 
     pressure on existing roads and communities, and to support growth 


Next Steps

Between 22 July and 25 September 2020 a period of public consultation was held on these proposals. The results from this consultation are currently being analysed and will help inform which aspects of these proposals will form the £13 million scheme, which is to be funded with £12.5 million through the West Yorkshire plus Transport Fund and £500,000 of Section 106 funding. Subject to consultation feedback, the list of design options will be reviewed and shortlisted and work on the final  scheme could start in early 2022. Future proposals (subject to funding) along the corridor will consider improvements at other sections of the route. More information will be provided here when available.

 

Contact us 

Via our Q&A tool:Submit your questions below 

Via email: yourvoice@westyorks-ca.gov.uk 

Via telephone:  0113 245 7676 (Metroline) 

Via post:  Freepost CONSULTATION TEAM (WYCA) 

 



You can read the Consultation Outcomes Report by clicking the link under 'Documents'.

Take a look at the 
2021 consultation page for the latest plans and updates.


Background

Kirklees Council and Leeds City Council, in partnership with the West Yorkshire Combined Authority, are developing an initial scheme for the A644 and A653 routes between Mirfield – Dewsbury – Leeds, that aims to improve travel opportunities, reliability and the local environment 

The scheme will help to promote access to jobs, education and services, and improvements in public health and includes new cycle tracks, new pedestrian crossings and footway improvements, bus lanes and bus super-stops (upgraded bus stops), junction upgrades, and other highway space adjustments. 

We would like to hear your views on the proposed improvements and would particularly like your feedback on the proposals to: 

  • Improve walking and cycling facilities 
  • Enhance bus lanes and facilities to improve bus reliability 
  • Upgrade junctions to improve congestion 
  • Improve landscaping 
  • Improve air quality 

The roads in question are key transport routes through areas of north Kirklees and south Leeds that are the focus of significant planned housing and economic growth over the next 10-15 years. Proposals for several major development sites are being worked up and will be brought forward / built at different speeds. It is important to recognise that the proposals being consulted on now for the Mirfield-Dewsbury-Leeds (Phase 1) project represent one stage of a longer term programme of transport investment into the area that will include:  

  • Alterations to road junctions to provide access to new development sites, often in phases 
  • Investment into the Transpennine rail network and stations, for example, through 
     the Transpennine Route upgrade
  • Upgrades at Mirfield, Ravensthorpe and Dewsbury stations and on the railway lines 
  • Transforming Cities Fund (TCF) projects, particularly in and around Dewsbury (projects for 
     Dewsbury Bus Station and Halifax Rd-Bradford Rd-Ring Road Junction will be publicly consulted 
     on in winter 2020/spring 2021 as part of the TCF programme). For more information 
     click here(External link) (open in a new tab)
  • Future phases of the Mirfield-Dewsbury-Leeds scheme, subject to new funding 
  • Exploration and assessment of strategic highway scheme options in North Kirklees to relieve 
     pressure on existing roads and communities, and to support growth 


Next Steps

Between 22 July and 25 September 2020 a period of public consultation was held on these proposals. The results from this consultation are currently being analysed and will help inform which aspects of these proposals will form the £13 million scheme, which is to be funded with £12.5 million through the West Yorkshire plus Transport Fund and £500,000 of Section 106 funding. Subject to consultation feedback, the list of design options will be reviewed and shortlisted and work on the final  scheme could start in early 2022. Future proposals (subject to funding) along the corridor will consider improvements at other sections of the route. More information will be provided here when available.

 

Contact us 

Via our Q&A tool:Submit your questions below 

Via email: yourvoice@westyorks-ca.gov.uk 

Via telephone:  0113 245 7676 (Metroline) 

Via post:  Freepost CONSULTATION TEAM (WYCA)